Specialist information can also be included in a schedule to fully record the condition of a building, such as the following;
- CCTV surveys of below ground drainage systems
- Testing and commissioning certification in relation to building services (mechanical and electrical)
- Engineers reports in relation to specific installations (such as passenger lifts as an example)
Dependent upon the situation, it can also be worthwhile preparing a layout drawing and/or a schedule of fixtures and fittings for inclusion within the Schedule of Condition. Such information can become invaluable at lease end in providing clarity as to exactly what existed at the commencement of the term and thereby help to avoid potential disputes over reinstatement requirements.